Engineering Report – August 4th Posted August 4, 2017 In Engineering Report Engineering Report – August 4th2017-08-042017-08-06http://fmars.marssociety.org/wp-content/uploads/2017/06/fmars_logo_400_black_menu.pngFlashline Stationhttp://fmars.marssociety.org/wp-content/uploads/2017/06/fmars_logo_400_black_menu.png200px200px 0 Alexandre Mangeot The previous pee barrel has been put away. It was nearly full. The ground condition is not good enough to move it to the disposal area. So it is still under the Hab, closed and secure.