rahasia wd berkali kali di mahjong ways 2 aura cuan mahjong ways 2 mahjong ways sebagai mesin cuan instan mahjong wins 3 gila gilaan kasih maxwin spin santai langsung wd mahjong wins scatter hitam tiba tiba muncul sekali putar scatter langsung tiga kejutan scatter hitam mahjong ways bongkar trik dewa mahjong ways mahjong ways jadi ladang cuan baru scatter datang terus scatter bisa nongol 4 sekaligus mahjong ways scatter hitam auto sultan sehari pola pancing scatter coba spin ini pola baru mahjong ways paling ajaib pemain baru mahjong wins auto sultan kok bisa mahjong ways kasih jackpot tengah malam gak main main mahjong wins bukan kaleng kaleng ini bukti nyatanya mahjong ways bikin nangis bahagia modal 20rb tembus 15 juta mahjong ways lagi hot modal kecil untung maksimal strategi spin rtp wins3 scatter hitam merah jp promo mahjong ways2 cuan pola gacor wins3 medan mahjong wins modal receh scatter hitam bonus melimpah cuma spin 10x langsung jp di mahjong ways bocoran pola mahjong ways dari orang dalam sensasi baru mahjong wins dengan fitur rahasia jackpot bertubi tubi mahjong wins laporan cuan mahjong ways 2 pgsoft provider game mahjong ways pola jitu game mahjong wins nyesel baru coba sekarang mahjong wins terbukti gacor total bocoran rtp mahjong ways hari ini update terbaru dari mahjong ways 2 wd 3 kali dalam satu jam di mahjong wins jackpot 300x mahjong wins 3 update tebaru dari mahjong ways 2 jepe mahjong 10k panduan mahjong2 pemula heylink macauklub heylink asiaklub heylink hksbet kapten76 heylink garuda76 heylink mpoxo mpoxo garuda76 asiaklub rawit303 mpoxl ABC1131 AMP pondok88 viral asiaklub viral macauklub situs gacor maxwin slot mahjong gacor andreuground.es/ amkamoments.com brenoparaiso.com awsbet.net Asli777 Mpogalaxy theinditravel.com slot gacor viral server luar negeri slot gacor server luar negeri slot thailand

FMARS-15 Engineering report 25-07-2023

 In Engineering Report

By Caleb Pool

The day began with a 2 crew EVA of Andrew and Andy donning suit simulators with Caleb as bear watch. It was found that the EVA suits and backpacks were in mediocre shape and required some modification which delayed the departure of the EVA to near noon. The strap buckles and adjusters had not been installed properly, severely limiting their usefulness and range. Mismatching of air vent diameter will require determining helmet/backpack compatibility at this facility. The helmet latching mechanisms, which get a lot of use, require shaking and excessive force to latch, and in some cases do not latch. A jumble of trickle chargers for the backpack batteries was found and sorted. It was noted that some of the wires had been cut for some reason as yet known. Two out of three chargers are inoperative and are on the Engineering bench for review. Communication during the EVA was accomplished through helmet-to-helmet communication primarily, with some comm through radio between the EVA team and the hab. The hab was heard loud and clear by the three member EVA team, and it was difficult for the hab to hear us through the helmets. The in-helmet earpieces and microphones were also in a tangled pile of wires. All but one mic/earpiece unit have failed and are on the Engineering bench for review. 

Genny, the generator we have been primarily using has leaked three times in the same location after two repairs. The failure mode is a splitting of the fuel line 5 cm “upstream” from the fuel intake. The tube is not the OEM fuel tube and was not installed by the FMARS15 crew. Due to the repeated failure, it is suspected that the replacement tube is weathered and too stiff to withstand the continued vibration of operation. There is a length of tube inside the hab that might not be as stiff that we will attempt to use for repair. In the interim, we are using Bambi and Rachel.

We have been running the generators most of the waking day since we started sim, we have not yet exhausted 1 of 2 diesel barrels of fuel, same goes for the gasoline. It has been noted that a mixture of 1/3 old diesel to 2/3 new diesel will run, but not as smoothly as fresh fuel. This is an emergency option as it will also likely clog the engine.

By end of day, the suit with crotch ripped open (labeled #2) had all major patches and sewing repairs complete. As with the other suits, more minor repairs remain, but Suit #2 is now in adequate condition for future EVAs. Only 2 usable sewing machine needles remain, and are being used as carefully as possible.