Engineering Report – August 11th Posted August 11, 2017 In Engineering Report Engineering Report – August 11th2017-08-112017-08-12http://fmars.marssociety.org/wp-content/uploads/2017/06/fmars_logo_400_black_menu.pngFlashline Stationhttp://fmars.marssociety.org/wp-content/uploads/2017/06/fmars_logo_400_black_menu.png200px200px 1 Alexandre Mangeot All systems running fine except the backpack charger which seems to have died. The LED do not light anymore. No voltage at the plug. I have not found other charger to replace it.