hadiah fantastis tanpa undi mahjong wins 3 1921 starlight princess bukan sulap 1922 mahjong sujud dulu 1923 mahjong saatnya berrsinar 1924 mahjong fenomena langka ABC1131 Slot Dana Gacor akun game server filipina teknik mahjong ways 2 ciri akun game gacor calon maxwin akun gacor princess akun gacor mahjong 1913 mahjong cepat kaya 1914 mahjong menang besar 1915 mahjong spin sekali 1916 mahjong kok jadi gini jalan menuju jackpot mahjong wins 3 sensasi cuan ngalir mahjong wins kemenangan terbukti jelas mahjong ways 2 pola kemenangan rahasia mahjong ways 2 kemenangan menantimu di mahjong ways dan mahjong wins 3 jalan pintas menang spektakuler mahjong ways 3 mesin cetak cuan mahjong wins game seru cuan tumpah mahjong wins 3 main mahjong wins black scatter kekuatan dadu mahjong ways 2 jackpot menggoda mahjong ways panen cuan beruntun mahjong ways 2 main mahjong dompet makin berat cuan ngalir tanpa henti mahjong ways 2 kisah fahmi trik sweet bonanza rutin kirim uang orang tua formula pola spiral mahjong ways 2 perkalian x2000 algoritma mahjong ways ramadan lebih stabil dan gacor 1925 game ghacor waktu luang 1926 koi gate sikat terus kapten76 heylink garuda76 heylink mpoxo mpoxo garuda76 rawit303 amp rawit303 mpoxl ABC1131 ABC1131 AMP

FMARS-15 Engineering Report 28-07-2023

 In Engineering Report

Sol: 5

By Caleb Pool

The windsock was temporarily installed at the north end of the FMARS airstrip. It functioned exactly as planned.

Items continue to be incinerated today. At least 6 barrel loads were incinerated with at least 3 more planned for tomorrow.

The generators continue to run on an at least 50/50 mix of new and old fuel.

The cleaning of the engineering shop is progressing: all tools now fit in the tool room. The effort will continue tomorrow.

Both engineers made substantial progress toward 2nd floor main area LED lighting install completion: armored cable was cut to length and connected to junction boxes, and lighting brackets were modified to accept round LED fixtures. Remaining related tasks include securing armored cable runs to wall, ceiling, and chain, mounting switch box to wall, and making final electrical connections.

Plans for tomorrow: pack items for removal, identify and correctly label the breaker for the EVA room exposed wires (and install an outlet), identify water pump parts for replacement.