skripsi cuankan mahjong wins3 modal 20k mahjongways2 dapat motor petani sumbawa cuan mahjong wins3 pola aman mahjong wins3 awsbet double bet baccarat stabilkan profit wild emas mahjongways2 di hari lahir setting auto play mahjong ways pola spin mahjong ways trik memainkan mahjong ways teknik gacor mahjong ways kombinasi scatter hitam daftar akun gacor mahjong wins strategi bermain mahjong ways 2 strategi gacor mahjong wins 3 8 keuntungan terbaik bermain mahjong ways maratona.icei.pucminas.br heylink macauklub heylink asiaklub heylink hksbet kapten76 heylink garuda76 heylink mpoxo mpoxo garuda76 asiaklub rawit303 mpoxl ABC1131 AMP pondok88 viral asiaklub viral macauklub situs gacor maxwin situs slot gacor slot mahjong gacor slot thailand

Sol Summary – August 2nd

 In Sol Summary

Sol 14 (or 94)

Today we started a campaign of studying EVA operations. The first phase was a non-sim EVA. The weather was wild, after a sunny and calm morning but by the time we started it was blowing a gale with drizzle and occasional snow. The rain (and snow) stopped about half way through. We will try to go back with suits tomorrow if it isn’t raining.

Otherwise we did work round the hab, including processing samples and data collected during the EVA. This is a major consumer of time, experience shows us that for every hour spent on EVA 1.5 hours is spent planning, preparing for, an following up EVA activities.

Hoping for better weather tomorrow.

Jon Clarke